› ‹
  • 1
  • 2
  • 3

Welcome to Dizamatra Powerindo

PT. Dizamatra Powerindo is one of the Indonesia's fastest growing Independent Power Producer (IPP) and coal mining exponential company. Since its foundation in 1994, the company’s business has grown exponentially. Projections for the next few years suggest the expansion is set to continue.

  • Default
  • Title
  • Date
  • Random
load more hold SHIFT key to load all load all

priamanaya-group-sm

PT. Dizamatra Powerindo is a member of Priamanaya Group Companies with its headquarter in Jakarta, Indonesia. 

Priamanaya Group is a Holding structure with more than 15 active firms under its management & control

Dizamatra Powerindo

Coal Mining

Besides Power Producer, PT. Dizamatra Powerindo is also a coal mining company and was incorporated in 1994. The company main operation is located in Lahat, South Sumatera - Indonesia.

Mining permit and decision by Bupati Lahat about "Izin Usaha Pertambangan Operasi Produksi Nomor: 503/172/KEP/PERTAMBEN/2010" for 20 years. In addition, PT. Dizamatra Powerindo has already got the "Clean & Clear Certificate" from Directorate General of Minerals & Coal at Announcement of Stage VIII.

Our Mining is geographically located between  3° 43' 18.48” S to 3° 45' 38.18” S Latitude and between 103° 35' 54.24” E to 103° 38' 47.04” E Longitude, on Sumatera Island, in South Sumatera Province, Lahat Regency, Sub-District of West Merapi. The mine of PT Dizamatra Powerindo can be reached in five hours from Palembang.

Since 2010 the Company has been producing sub-bituminous coal having in average following coal characteristic:

  • Calorific Value 4784.2 (kcal/kg GAR)
  • Total Moisture 29% (ar)
  • Total Suplhur 0.7 % (adb)
  • Ash Content 11.6 % (adb)
  • Volatile Matter 37.93 % (adb)
  • Fixed Carbon 36.86 % (adb)

This product is used for the domestic market as well as for export.
As per reference of the technical report JORC 2012 (Australia), PT Dizamatra Powerindo has potential of minable coal resource in the amount of 205 million tons (Block B).

According to the JORC report (code 2012) issued by PT. New Resource Mine Consulting (PT. NRM), the company's mine-able resource in Block B amounts to 205 million tons.

Coal Resource :

- Block A                         14.200.000 tones
- Block B (JORC 2012)    205.000.000 tones
                                   219.200.000 tones

Coal Reserve :
- Block A                         10.750.000 tones
- Block B (JORC 2012)     139.100.000 tones
                                    149.850.000 tones

The company conducts mining operation using conventional cast type: land clearance, stripping (top soil, over-burden, coal), hauling, dumping/stocking (top soil. over-burden, coal). During mining mine water is pumped and discharged into settling ponds to control environmental impacts.

 

Sibayak Geothermal Power Plant

PLTP SibayakSibayak Area is located in Brastagi Regency, North Sumatra. The current total installed capacity of the PLTP is 12 MW consisting of 1 Unit of Monoblock of 2 MW and 2 Units of PLTP of 2x5MW constituting ESC (Energy Sales Contract) with PT PLN, meanwhile 10 MW constitutes SSC (Steam Sales Contract) with PT Dizamatra Powerindo. The project was inaugurated by President Susilo Bambang Yudhoyono on December 11, 2007 simultaneously with the inauguration of PLTP Kamojang Unit 4 and Lahendong Unit 2.

This power plant is the first geothermal power plants on the island of Sumatera. Taking the heat of the earth from Mount Sibayak, the electricity from the plant was sold to PT PLN (Persero) to illuminate the province of North Sumatra and surrounding areas. 

Geothermal potential of Mount Sibayak is enough and safe for the environment. It’s safe from catastrophic volcanic eruptions as Sibayak mountain is not expected to erupt again.

With a height of 1358 m above sea level, located 70 km from Medan City and 7 Km from Berastagi town tourism, this geothermal power plant is one of three geothermal power plants managed by PT PGE than Kamojang (West Java) and Lahendong (North Sulawesi). PT PGE is a subsidiary of PT Pertamina (Persero) which is engaged in the management of geothermal energy.

 

 

 

Our Business

Sibayak Geothermal Power PlantSibayak Geothermal Power Plant

About Dizamatra Powerindo

PT. Dizamatra Powerindo is one of the Indonesia's fastest growing Independent Power Producer (IPP) and coal mining exponential company. Since its foundation in 1994, the company’s business has grown exponentially. Projections for the next few years suggest the expansion is set to continue.

PT. Dizamatra Powerindo is a member of Priamanaya Group Companies with its headquarter in Jakarta, Indonesia. Priamanaya Group is a Holding structure with more than 15 active firms under its management & control

PT. Dizamatra Powerindo builds and operate a Geothermal Power plant located in Sibayak, Brastagi Regency, North Sumatra. The current total installed capacity of the PLTP is 12 MW. Taking the heat of the earth from Mount Sibayak, the electricity from the plant was sold to PT PLN (Persero) to illuminate the province of North Sumatra and surrounding areas.

PT. Dizamatra Powerindo also engaged in coal mining business located in Lahat, South Sumatera. Mining permit and Decision by Bupati Lahat about “Izin Usaha Pertambangan Operasi Produksi Nomor 503/172/KEP/PERTAMBEN/2010” for 20 years. In addition, PT Dizamatra Powerindo, has already got the “Clean & Clear Certificate” from Director General of Minerals & Coal at Announcement of Stage VIII.

Coal Mining Operation

  • LOCATION: Our mining operation is located on Sumatera Island, in South Sumatera Province, Lahat Regency, Sub-District of West Merapi. The Mine of PT. Dizamatra Powerindo can be reached in five hours from Palembang.
  • 1
  • 2
  • 3